Event |
|
A six-member team of the CWC inspected the Krishnagiri Dam in connection with the renovation of its shutter on December 20, 2018. |
A six-member team of the CWC inspected the Krishnagiri Dam in connection with the renovation of its shutter on December 20, 2018. The team comprised Gulshan Raj, Chief Engineer, Dam Safety Organisation (DSO), Harkesh Kumar, Director, Gates Design, CWC; Dy. Director (DRIP) along with CPMU Experts. |